Heating system:

The central heating plant was installed to cover greenhouse’s heating loses was 800.000Kcal (950kW) by using Diesel for fuel. The boiler room is consisted of:

  • 1 steel boiler with one burner.
  • 2 water collectors, with 2 water pumps.
  • steel pipes for the circulation of the water

The heat exchange was done by:

  • Onfloor heating plastic pipes (Geotherm)

Spraying system:

The spraying system installed in the greenhouse is consisted of:

  • 2 LVM 2001 TR, which are fixed in the greenhouse
  • 1 air compressor which is located in the boiler room
  • 1 electric board, to control the spraying
  • air pipe network
Owner: 
Ath. Doldouris
 
Project location: 
Agios Georgios, Veroia, Greece
 
Project area: 
3.000 sq.m.
 
Date: 
2009