Works and News mini panel
Heating system:
The central heating plant was installed to cover greenhouse’s heating loses was 800.000Kcal (950kW) by using Diesel for fuel. The boiler room is consisted of:
- 1 steel boiler with one burner.
- 2 water collectors, with 2 water pumps.
- steel pipes for the circulation of the water
The heat exchange was done by:
- Onfloor heating plastic pipes (Geotherm)
Spraying system:
The spraying system installed in the greenhouse is consisted of:
- 2 LVM 2001 TR, which are fixed in the greenhouse
- 1 air compressor which is located in the boiler room
- 1 electric board, to control the spraying
- air pipe network
Owner:
Ath. Doldouris
Project location:
Agios Georgios, Veroia, Greece
Project area:
3.000 sq.m.
Date:
2009 


